ACI Roadmap
PHASE 1: Existing ORION infrastructure
- Objective: Stabilize current Emergency Response capabilities.
- Required Components: Keycloak, OPA, TITAN, PHOENIX.
- Dependencies: None.
- Tests: Core integration tests.
- Measurable Criteria: System runs stably.
- Resource: Solo developer.
PHASE 2: AURA intelligence core
- Objective: Implement multimodal local reasoning.
- Required Components: AURA Orchestration, AURA Memory.
- Dependencies: Phase 1.
- Measurable Criteria: Passes baseline reasoning eval.
- Resource: Solo developer + Local GPU.
PHASE 3: OMNIS world model
- Objective: Graph-based entity representation.
- Required Components: Graph DB, Causal schemas.
- Dependencies: Phase 2.
- Measurable Criteria: Can represent drought causal chain.
- Resource: Solo developer.
PHASE 4: NEXUS multi-agent fabric
- Objective: Multi-agent coordination.
- Required Components: Agent Registry, Dispute Resolution.
- Dependencies: Phase 3.
- Measurable Criteria: 3 agents solve a cross-domain problem.
- Resource: Solo developer.
PHASE 5: FORGE scientific engine
- Objective: Automated hypothesis testing.
- Required Components: Simulation sandboxes.
- Dependencies: Phase 4.
- Measurable Criteria: Generates and tests 1 valid hypothesis.
- Resource: Solo developer.
PHASE 6: ASCEND long-horizon planning
- Objective: Multi-year planning.
- Required Components: Objective solver, Error tracking.
- Dependencies: Phase 4.
- Measurable Criteria: Generates 10-year plan, adapts to 1 simulated disruption.
- Resource: Solo developer.
PHASE 7: Civilization simulation
- Objective: Synthetic civilization (10M population).
- Required Components: MIRROR extension.
- Dependencies: Phase 3, Phase 6.
- Measurable Criteria: Runs 20 simulated years stably.
- Resource: Team / Cloud Compute.
PHASE 8: Controlled real-world interfaces
- Objective: Safe physical actuation.
- Required Components: VEIL Governance, IoT bindings.
- Dependencies: Phase 1, Phase 7.
- Measurable Criteria: Passes strict security audit for actuation.
- Resource: Team.
PHASE 9: ACI benchmark
- Objective: Formal testing against ACI-001.
- Required Components: Evaluation harness.
- Dependencies: Phase 7.
- Measurable Criteria: Validated score > 50/100.
- Resource: Solo developer / Team.
PHASE 10: Independent evaluation
- Objective: Third-party verification.
- Required Components: Documentation, reproducible environment.
- Dependencies: Phase 9.
- Measurable Criteria: External confirmation of ACI claims.
- Resource: External Auditors.